Project Description

  • Heavy Duty Cattle Yards constructed in the North West of Western Australia
  • 2000 Head Working Capacity
  • 100 NB Posts & 65 NB Rails
  • Built with CNC Steel Post & Rail System
  • 8m Heavy Duty Concrete Loading Ramp
  • Heavy Duty Calf Cradle & Race
  • Hydraulic Slide Gates & 5 Way Drafting System
  • Heavy Duty Cattle Crush
  • Integrated Roof System
  • Full 3D Working CAD Design prior to Manufacture

 

The project included: Design; Fabrication; Delivery to site; Structural, mechanical and installation onsite

(12 weeks Start to Finish)