Project Description
- 4 x Sets Heavy Duty Cattle Yards constructed in the North West of Western Australia
- 1200 Head Working Capacity Each
- 100 & 80NB Posts & 40 NB Rails
- Built with CNC Steel Post & Rail System
- 8m Heavy Duty Concrete Loading Ramps
- Heavy Duty Calf / Weaner Cradles & Races
- Pneumatic Adjustable Width Races & 5 Way Race Drafting Systems
- Heavy Duty Cattle Crush’s
- Full 3D Working CAD Design prior to Manufacture
The project included: Design; Fabrication; Structural, mechanical and installation onsite
(5 weeks each Start to Finish)